AAR181-S00
Yokogawa
T/T
1 year
Availability: | |
---|---|
Quantity: | |
Description
The measurement period is set within the data update interval between the first point where the reference input signal (synchronization source) crosses the level zero point (center of the amplitude) on the rising trigger slope (or falling trigger slope) and the last point where the synchronization source crosses the level zero point (center of the amplitude) on the rising slope (or falling slope).1, 2 However, the measurement period for determining the numeric data of the peak voltage or peak current is the entire span of the data update interval. Therefore, the measurement period for the measurement functions that are determined using the maximum voltage or current value (U+pk, U-pk, I+pk, I-pk, CfU, and CfI) is also the entire span of the data update interval. • The WT500 determines whether to define the measurement period using the rising or falling edge automatically by choosing the method that will result in the longest measurement period. • If there is not more than one rising or falling slope within the data update interval, the entire data update interval is set as the measurement period. • You can select which input signal will be the synchronization source (synchronized to the zero-crossing point of the input signal) for each element. You can set the synchronization source signal to the voltage, current, or external clock input signal. • For details, see appendix 6. 1 Trigger slope refers to the movement of the signal from a low level to a high level (rising edge) or from a high level to a low level (falling edge). 2 The data update interval is the interval at which the data that is used in measurement functions is sampled. For details on how to set the interval, see section 2.3, “Data Update Rate.”
Yokogawa Main Products
AAT145-S00 | VI701 | ST2*D |
ADV151-P03 | VI702 | VM1*D |
ADV151-P00 | PW302 | ST3*A |
AAI143-S00 | CP345 | PAC*A |
AAR181-S00 | AIP532 | NM29*A |
AAP135-S00 | AIP502 | ALU4*D |
ADV551-P00 | AIP601 | CTL4*B |
Strong PLC Parts Series:
ABB PLC
DCS 800xA System/S800 I/O System, ADCS 800xA System/S900 I/O Series, Advant OCS/800XA , H&B Freelance 2000 , BAILEY-INFI90/Bailey Net 90, DSQC Robot Parts, PLC cards and boards
Honeywell DCS
Experion PKS ( C200 , C300 ), FSC
Bently Nevada TSI
Bently Nevada 3500 Series Monitor system, Bently Nevada 3300 Series Monitor system
Modules/Chassis/I/O Module, Power Supply Module/Proximitor Sensor/ Programming Cable
Fanuc PLC
IC695, IC698, IC694, IC697, IC754, IC752 QuickPanel, IC660, IC600 Seriex Six, IC610, IC620 Series One, IC692 Series 90-20, IS200, IS215, DS200, DS3000/3800
Invensys Foxboro DCS
Foxboro I/A Series System Module.Foxboro CP /Foxboro FBM , Foxboro Termination Assembly Module, Foxboro Baseplate
More Products
FCM10E | DS200UPSAG1AGD | F6705 | 5X00462G02 |
P0972VA | DS200KLDCG1AAA | F7105A | 5X00405G03 |
P0903CW | DS200TBQBG1ACB | F7126 | 5X00496G01 |
FBM215 | DS215SDCCG1AZZ01B | F7130 | 5X00286H13 |
FBM201 P0914SQ | DS200LDCCH1ALA | F7130A | 5X00059G01 |
BO123HE | DS200TCQAG1B | F7131 | 5X00369G01 |
FBM237 P0914XS | DS200STBAG1ACB | F7133 | 5X00229G04 |
FBM242 P0916TA | DS200DCFBG2BNC | F7553 | 5X00115H08 |
FBM207c | DS200TCPSG1APE | F8621A | 5X00369G02 |
FBM204 | DS200CTBAG1ADD | F8628X | 5X00124H02 |
FBM219 P0916RH | DS200UPSAG1AGD | F8641 | 5X00167G01 |
FEM100 P0973CA | DS200PTBAG1ADC | F8650 | 5X00425H01 |
Delivery Time
We accept Westem Union,T/T.
We cooperate with T/T, Western Union. You can receive the goods within 3 to 5 days.
About us
Our company main supply PLC and DCS Module, Power Supply Module, Input Module, Output Module, I/O Module, Rack, Panels, Proximitor Sensor, Programming Cable,Terminal Blocks et.
Description
The measurement period is set within the data update interval between the first point where the reference input signal (synchronization source) crosses the level zero point (center of the amplitude) on the rising trigger slope (or falling trigger slope) and the last point where the synchronization source crosses the level zero point (center of the amplitude) on the rising slope (or falling slope).1, 2 However, the measurement period for determining the numeric data of the peak voltage or peak current is the entire span of the data update interval. Therefore, the measurement period for the measurement functions that are determined using the maximum voltage or current value (U+pk, U-pk, I+pk, I-pk, CfU, and CfI) is also the entire span of the data update interval. • The WT500 determines whether to define the measurement period using the rising or falling edge automatically by choosing the method that will result in the longest measurement period. • If there is not more than one rising or falling slope within the data update interval, the entire data update interval is set as the measurement period. • You can select which input signal will be the synchronization source (synchronized to the zero-crossing point of the input signal) for each element. You can set the synchronization source signal to the voltage, current, or external clock input signal. • For details, see appendix 6. 1 Trigger slope refers to the movement of the signal from a low level to a high level (rising edge) or from a high level to a low level (falling edge). 2 The data update interval is the interval at which the data that is used in measurement functions is sampled. For details on how to set the interval, see section 2.3, “Data Update Rate.”
Yokogawa Main Products
AAT145-S00 | VI701 | ST2*D |
ADV151-P03 | VI702 | VM1*D |
ADV151-P00 | PW302 | ST3*A |
AAI143-S00 | CP345 | PAC*A |
AAR181-S00 | AIP532 | NM29*A |
AAP135-S00 | AIP502 | ALU4*D |
ADV551-P00 | AIP601 | CTL4*B |
Strong PLC Parts Series:
ABB PLC
DCS 800xA System/S800 I/O System, ADCS 800xA System/S900 I/O Series, Advant OCS/800XA , H&B Freelance 2000 , BAILEY-INFI90/Bailey Net 90, DSQC Robot Parts, PLC cards and boards
Honeywell DCS
Experion PKS ( C200 , C300 ), FSC
Bently Nevada TSI
Bently Nevada 3500 Series Monitor system, Bently Nevada 3300 Series Monitor system
Modules/Chassis/I/O Module, Power Supply Module/Proximitor Sensor/ Programming Cable
Fanuc PLC
IC695, IC698, IC694, IC697, IC754, IC752 QuickPanel, IC660, IC600 Seriex Six, IC610, IC620 Series One, IC692 Series 90-20, IS200, IS215, DS200, DS3000/3800
Invensys Foxboro DCS
Foxboro I/A Series System Module.Foxboro CP /Foxboro FBM , Foxboro Termination Assembly Module, Foxboro Baseplate
More Products
FCM10E | DS200UPSAG1AGD | F6705 | 5X00462G02 |
P0972VA | DS200KLDCG1AAA | F7105A | 5X00405G03 |
P0903CW | DS200TBQBG1ACB | F7126 | 5X00496G01 |
FBM215 | DS215SDCCG1AZZ01B | F7130 | 5X00286H13 |
FBM201 P0914SQ | DS200LDCCH1ALA | F7130A | 5X00059G01 |
BO123HE | DS200TCQAG1B | F7131 | 5X00369G01 |
FBM237 P0914XS | DS200STBAG1ACB | F7133 | 5X00229G04 |
FBM242 P0916TA | DS200DCFBG2BNC | F7553 | 5X00115H08 |
FBM207c | DS200TCPSG1APE | F8621A | 5X00369G02 |
FBM204 | DS200CTBAG1ADD | F8628X | 5X00124H02 |
FBM219 P0916RH | DS200UPSAG1AGD | F8641 | 5X00167G01 |
FEM100 P0973CA | DS200PTBAG1ADC | F8650 | 5X00425H01 |
Delivery Time
We accept Westem Union,T/T.
We cooperate with T/T, Western Union. You can receive the goods within 3 to 5 days.
About us
Our company main supply PLC and DCS Module, Power Supply Module, Input Module, Output Module, I/O Module, Rack, Panels, Proximitor Sensor, Programming Cable,Terminal Blocks et.