Siemens Simatic 6ES7407-0KR02-0AA0 Module
Home » Products » Siemens » Siemens Simatic 6ES7407-0KR02-0AA0 Module

Product Category

Contact Us

Email:sales3@5gplc.com

Address:No.601, Hongwen Liuli, Siming District, Xiamen, China

Siemens Simatic 6ES7407-0KR02-0AA0 Module Siemens Simatic 6ES7407-0KR02-0AA0 Module
Siemens Simatic 6ES7407-0KR02-0AA0 Module Siemens Simatic 6ES7407-0KR02-0AA0 Module
Siemens Simatic 6ES7407-0KR02-0AA0 Module Siemens Simatic 6ES7407-0KR02-0AA0 Module
Siemens Simatic 6ES7407-0KR02-0AA0 Module Siemens Simatic 6ES7407-0KR02-0AA0 Module
Siemens Simatic 6ES7407-0KR02-0AA0 Module Siemens Simatic 6ES7407-0KR02-0AA0 Module

loading

Siemens Simatic 6ES7407-0KR02-0AA0 Module

Siemens Simatic 6ES7407-0KR02-0AA0 Module
  • 6ES7407-0KR02-0AA0

  • Siemens

  • T/T

  • 1 year

Availability:
Quantity:

Description

Since replacing the PLC CPU also requires changing the PLC entire back plane, any modules that were previously used in the S5 rack must also be replaced. This includes all I/O modules, function modules, and communication modules. c. Interface Modules in Local Expansion Racks In legacy S5 applications, there may have been more than one tier of modules (local expansion racks) connected to the main rack. In these cases, all the modules will have to be replaced with S7 modules. If using the S7-300 family, a similar architecture can be achieved using the IM360, IM361, and IM365 modules to expand the main rack. If using the S7-400 family, the IM460 and IM461 are used. Another possible thing to consider is to move the modules to a remote rack and use the IM463 interface as shown below. This might be cost effective since you could reuse the S5 I/O modules. The following sketch shows remote racks of S5 type connected to a S7 main rack through the IM463. Note this could be a possible setup for both intermediate performance and high performance systems. The IM463 interface is very easy to program. Very similar to a DP coupler in that it has S5 addresses assigned on one side and S7 addresses assigned on the other side. Experience has proven that the correct length of the 721 cable is important. There is a switch on the front of the IM463 module which must be set to the length of the 721 cable. There are 4 choices for length. Again, the other way to migrate the system would be to convert the remote racks and all of the modules to ET200M. It may be wise to make several estimates of hardware conversions, and choose the most cost effective approach. 


Strong PLC Parts Series:

ABB PLC

DCS 800xA System/S800 I/O System, ADCS 800xA System/S900 I/O Series, Advant OCS/800XA ,  H&B Freelance 2000 , BAILEY-INFI90/Bailey Net 90,  DSQC Robot Parts,  PLC cards and boards

Honeywell DCS

Experion PKS ( C200 ,  C300 ), FSC

Bently Nevada TSI

Bently Nevada  3500 Series Monitor system, Bently Nevada  3300 Series Monitor system

Modules/Chassis/I/O Module,  Power Supply Module/Proximitor Sensor/ Programming Cable

Fanuc PLC

IC695, IC698,  IC694, IC697,  IC754,  IC752 QuickPanel, IC660,  IC600   Seriex Six,  IC610, IC620  Series One, IC692  Series 90-20,  IS200, IS215, DS200, DS3000/3800


Siemens Main Products

300630073008
36254119A3703E
4351B3636T3721
3604E83123625C1
37213805E3503E
3700A4351A8111
4329DO34013007


More Products

3500/42   138700-01MU-TAIH533BHB002000R0001 12P3275X022 KJ3204X1-BA1
330180-91-0510012/1/23BHB003154R0101KJ3221X1-BA1 12P2531X132 VE4035S2B1
3500/50 133434-01MU-GAIH143BHB003230R0101KJ3001X1-BB1 12P0550X142
3500/42 140471-01MU-GAIH223BHB012961R0001 KJ3204X1-BA1 12P3275X022
125680-018U-PDIPA13BHE014105R0001 KJ3225X1-BA1 12P4174X032
330180-51-00CC-PAIM013BHE023784R2530KJ3204X1-BK1 SE4002S1T2B6
136188-0251410069-1753BHE024577R0101 KJ2231X1-EA1
125704-018C-PCIW02 51454363-2753BHB003387R0101KJ3102X1-BA1 12P1863X032
3500/3351202974-1003BHB013088R0001KJ4001X1-NA1 12P3373X012
128229-018C-PAOH51 51454355-1753BHE009684R010112P0631X012
133819-0251202335-3003BHB006485R0001KJ3002X1-BG2 12P1731X082
3500/60 133819-018U-TAIDA13BHL000385P0101KJ3002X1-BB1 12P0683X082


FAQ

1.Is the part new? 

   Yes, 100% Original brand new

2.How is the package?

   Original factory seal packed

3.What is the lead time?

   In stock: 1-3 working days

4.What is the MOQ: 

   1pcs

5.What is the payment term:

   T/T 

6.What is the warranty time?

   One year



Previous: 
Next: